Main projects

Methods of concrete substrates concrete ready in a large water project in the province of sight 32 meters and diameter (30×30)

Methods of concrete pillars articulated ready in the project Ben Firnas residential in the province of Baghdad depth of 18 meters and diameter (30×30)

Implementation of the pillars of drilling for the project of the international hotel in the area of Jadiriyah in Baghdad, Qatar 1 meters and depth of 20 meters and 240

The implementation of the pillars of drilling in the bridge of Kirkuk, Qatar, 1 m and depth of 20 meters and a number of 100 bore piles

Drilling bore piles of (120 CM) and (36M) long in Bab Al Mua’dham Bridge.

Drilling bore piles of (150 CM) and (29M) long in Barbuttiand SimawahBridges.

Drilling bore piles of (120 CM) and (29M) long in Hillal and Bridge.

Drilling bore pile of (70 CM) and (18M) long in Erbil Street 120 Intersection.

Drilling 130 bore piles of (1 M ) and (23M) long for a Mall in Erbil.

Drilling 100 bore piles of (70 CM) and (27M) long for Al-Hayaniah water project in Basrah.

Driving (12M) precast piles for Al-Rasafah water project.

Driving (18M and 35X35 CM) joined precast piles for Al-Zubaidyah Electric Station.

Drilling of 45 bore piles of (1.5M) for Bridges in Al-Simawah and Diwaniyah .

Drilling of 210 bore piles of (80CM and 120CM) and (20M) long for Al-Zuhour Intersection.

Driving of 600 steel pipes of (60CM) and (21M) long for Al-Mathaf Intersection Bridge.

Drilling of 220 bore piles of (100CM) and (18M) long for Al-Hamediah Electric station.

Supply and driving of 945 precast concrete piles of (28.5X28.5 CM and 12M long) for Internet building in Baghdad.

Driving of 250 precast piles of (35X35 CM and 12M long) in Al-Su’abaih Refinery in Basrah.

The company join ventured with Al-Liqa’a Bureau for Piling tests executed more than 200 piles test with load of 60-800 tons in different projects all over Iraq.